THE USE OF METAL DESIGN IN HIGH QUALITY FABRICATION

₦ 5,000.00
i h

ABSTRACT

During the time of rendering this project, few challenges were encountered. One of the major challenges encountered was the hike in dollar which affected the cost of materials some of the materials doubled in price, like the 1 by 1 pipe moved from 1700 naira to 5000, which affected the earlier budget. This lead to re-evaluation of the entire plan, thereby changing the original design of the shelf, also change to cheaper materials and also contributed additional funds so as to meet up with the target. However it should be noted that this challenge faced with, majorly affected just the shelf, because materials for the shelf were not gotten before that time, by  this time the work for the window was already completed, most of the materials for the door were already on ground. There was also a challenge with coating copper sheet with acid resistant material before etching, we were coating, cleaning off the failed coating and then recoating, this was repeated for about three times but eventually got the hang of it and was able to coat it properly.

0.0 0
Write your own review Close
  • Only registered users can write reviews
*
*
  • Bad
  • Excellent
*
*
*
Only registered users can write reviews